PEB VS. CONENTIONAL STEEL BUILDINGS
ADVANTAGES OF PRE-ENINEERED STEEL BUILDINGS

PEB VS. CONVENTIONAL STEEL BUILDINGS

ADVANTAGES OF PRE-ENGINEERED STEEL BUILDINGS

 What is the main difference between conventional hot-rolled steel construction and PEB (Pre-Engineered Building) system of construction.   

Key differences are: 

PEB system is highly efficient in design due to synergy between building components. Primary members are made of tapered built-up sections and roof/wall secondary members from cold rolled sections designed as continuous beams. Tapered built up sections allows for custom designing the member as required. High strength steel is used and all structural elements are fully optimized by computerized design program. This leads to significant reduction in dead load reactions to foundations and reduction in overall weight of steel used.

Site erection is fast and simple - just bolting together the various building components as per the erection drawings provided. No site fabrication or welding is involved. Due to this, quality is far more superior and a large chunk of time is saved in comparison to conventional steel construction methods.


 What is the percentage of saving in steel structure using PEB systems compared to conventional steel buildings?

On average the estimated savings is between 20-40%. It depends on design code considered and building dimensions.

PEB's are lighter through efficient use of steel. Primary framing members are tapered (varying depths) built-up sections with large depths in the areas of highest stress. Secondary members are light gage (light weight) roll-formed (lower labor cost) Z or C shaped members. 

Primary steel members are selected from standard hot rolled "I" sections which are in many segments of the members, heavier than what is actually required by design. Members have constant cross sections regardless of the varying magnitude of the local internal stresses along the member length. Secondary members are selected from standard hot rolled I or C sections, which are heavier.



                                                                    Dalal Steel Industries - Pre-Engineered Building for Bottling Facility, Nigeria

 Is there a difference of delivery time?

PEB's typically take an average 6 to 8 weeks to fabricate. Conventional steel buildings take an average 20-26 weeks (to include special procurement of required sections).


 What is the percentage of saving in foundation costs using PEB systems compared to conventional steel buildings?

Due to the difference in structure weight, PEB's reqiure simple design, easy to construct and light weight. Conventional buildings require heavy foundations. We estimate savings to be at least 5%. For fixed bases, the saving could be in excess of 15%.


 Is there a difference with erection cost and time between PEB and conventional building?

Conventional steel buildings are 20% more expensive than PEB. Members are heavier, need heavy equipment and need extensive field labor.


 Is it possible to have concrete slabs for different floors and how is the slab laid above the steel structure?

Yes, we can provide steel deck over steel floor framing to receive cast in site slab. The steel deck acts as a shutter to support the wet concrete. The slab should be reinforced and designed for the total floor load.


 Are your connections site bolted or welded?

All field connections are bolted. There is absolutely no site welding required. This considerably reduces the time for site erection.


 Is it possible to dismantle the building and rebuild at another place? What will be the cost of new and reassembled building?

Yes, since the building is site assembled by bolting, it is possible to dismantle and rebuild at a new location.



Dalal Steel Industries - Pre-Engineered Building for Army Base

 It appears that you have to predetermine all the requirements before ordering the building. . What is the flexibility available for any change in requirements later? 

It is more economical to initially design the building incorporating future requirements like increasing width, length, loading additional cranes, etc. This will avoid any site modification work later. However in cases where a client needs a building modification, which was not previously considered, this can be done by making the changes on site. 


 Will you provide design details before supplying/erecting your structures?

Yes, after getting the order, we first send out drawings for customer approval. All comments received from the client on the approval drawings are incorporated in the final drawings. After fabrication completed, we will release Erection drawings complete to include all part marks as labeled on the packing lists. Design calculations notes are also available upon request.


 Please explain compatibility to fire resistance requirements of a main structural frames, covering etc. Modification to existing structure - is it done by welding or bolting?

Fire resistance on steel structure can be achieved by enclosing the steel with a fire protection system (cementitious or intumescent). The steel can also be enclosed with gypsum/cement board as per UL approved details.


 Why choose Pre-engineered Steel Building over concrete building when wide column spans is not an issue?

The global weight of steel building is lighter than a concrete building, therefore you can expect savings in foundation size and cost. Pre-Engineered Building Company is that it is both the designer and the fabricator of the building project. Therefore there is virtually no engineering service or process that can be identified as distinct from the fabricated product. In fact, a primary engineering objective is to make the fabrication process more efficient through design and detailing solutions which address economy of material and man-hours. At the same time, it addresses quality and time saving. Pre-engineering buildings are ideal to ensure structural integrity as engineering services or quality control on structural members and supervision, are not required on site.


SHARE

     
Know More About Prefabs!